Stewart County, GA
The scope of this project included total modernization of the existing K-5 facility, a new 22,000 square foot competition gymnasium, a new high school CTAE and classroom building, new defined separate entrances into the Elementary side and the Middle/High School side of the school with secured vestibules at each.
This project also included replacement of the grease trap, new cooler/freezer, update of electrical panels, lighting, and power throughout the buildings, new HVAC systems, modernization of toilet facilities meeting ADA requirements, and new ceilings and floor coverings throughout the buildings of the entire K-12 school.
Zebulon, GA
Renovation included new sidewalks, fencing, scoreboard, home/pressbox and visitors’ bleachers, and three concessions and restroom buildings.
Buena Vista, GA
This new one story high school with 146,000 square feet was completed Summer of 2012. It utilizes daylight harvesting in all major spaces such as the media center, cafeteria, gymnasium and main entry. This design feature will aid in conservation of energy and aid in cutting operating costs.
The school includes core classrooms as well as science, art, music, special education, and technical and career education. The major spaces are a cafeteria, kitchen, media center, administration wing and gymnasium. The project also included all athletic fields.