Macon, GA

The scope of this phased project, with 477 FTE and 39 instructional units, included new HVAC, roof, refinishing classroom casework, paint, flooring, doors, ceiling tile/grid, kitchen equipment, specially equipped classroom, fire alarm upgrades, ADA compliance, and building façade upgrades.  

New windows were installed throughout this entire elementary building as well as a completely new stucco façade and paint.  This brought more natural light and views to the interior environment.  Along with bringing more natural light, the interiors were brightened with the use of vibrant colors and floor patterns.  All finishes were chosen not only for their aesthetic qualities, but also for their cleanability and sustainability.  

Talbotton, GA

The scope of this project included total modernization of the existing K-12 facility, and a new 22,000 square foot competition gymnasium.  There were also two new main entry additions constructed to separate the elementary and middle/high administration areas, and increased security access.

This project also included replacement of grease trap and backflow preventer, a new roof, repair of electrical panels, lighting, and power throughout the buildings, replacing PA and clock systems, replacement of some exterior doors and frames, replacement of toilet partitions and fittings, and new floor and carpet throughout the buildings of the entire K-12 school.

Macon, GA

The scope of this phased project included a new metal roof,  paint, flooring, classroom countertops and reception desk upgrades, markerboards, gym flooring, suspended acoustical panels, secured vestibule, new specially equipped classrooms, fire alarm upgrades,  and HVAC upgrades. 

In conjunction with the necessary safety and security upgrades, a new roof was added which updated the exterior of the building.  The interiors were updated with new flooring, paint, and suspended acoustical panels.  The new interior colors were chosen to add a fresh look while still complimenting the existing finishes that remained. Site work also included was a new parent pick-up loop with canopy.  Other revisions were also made to create more efficient traffic flow and faster loading and unloading times.  